RoadworksJ3 → J5 · NB
M90 J3 Halbeath to J5 Gairneybridge - Lane Closure N/B
Northbound
Ongoing
1 incident reported at M90 J3.
Updated 21:24 · refreshes every 5 min
Northbound
Against the usual time for this hour
Traffic information from Traffic Scotland. Intellectual property rights in this data belong to Transport Scotland.
J3, Halbeath, connects the M90 with the A907 and A92 and is signposted for Dunfermline, Kirkcaldy, Glenrothes and The South.
Signposted: Dunfermline · Kirkcaldy · Glenrothes · The South · Edinburgh · The North
Junction details © OpenStreetMap contributors
See the whole route on M90 traffic, check M90 accidents, or look at M90 closures before you travel.